Abstract:The steam load will fluctuate sharply with opening and closing of the equipment which is operated intermittently in a steam network. The fluctation of steam load directly leads to uneconomic boiler operation and poor product quality. To solve this problem, the author presents a mathematic method to manage the open time of the intermittent operating equipment, so as to even the fluctuation of steam load. This method has proved a success in practice.