Abstract:The manufacturing process of steam- generator supporting-plate applied inPressurized Water Reactor (PWR) of nuclear power plant is dealt with in the paper. The techni-cal schedule of manufacturing process is optimized by applying the theory of multi-goal fuzzyoptimization dynamic programming and a satisfying result is obtained.