Abstract:Among all the factors that take effect on this process,the dimension of the shield tunnelling machine and the engineering characteristic of soil are the two main factors of great importance.Under this precondition,a numerical analysis was conducted to estimate the movement of a shield tunnelling machine.The analysis simulated the process of direction change and forward movement.Furthermore, the relation between the direction change and the two factors mentioned above was revealed.